Project Profile :
|
Project Name : Petco Store Project Details:
Petco Store
These central splits were installed in the ceiling plenum with piping connected to the condensing units on the roof . The controls for this project are integrated with the internet allowing for flexibility of temp control from multiple locations. Exhaust ducting and fresh air ducting was applied. This Plan and spec job was finished well before the deadline for opening!
|
|






